Westway III

$1.00

Location: Bedford, Nova Scotia

Client: The Armour Group

Architect: FBM Architecture

Certifications: N/A

Size: 50,000 sq. ft.

Project Budget: N/A

Westway III is the third building built at the Westway Park campus in Bedford, Nova Scotia. 

M&R Engineering was responsible for mechanical design including HVAC, Plumbing and Fire Protection as well as electrical design including Lighting, Power, Communications and Security and Sustainability Consulting (Commissioning and Energy Modeling).

Key Facts: 

  • The building is situated on an east-west axis to minimize peak cooling loads.

  • A green roof is installed on part of the building, reducing storm water runoff and attracting wildlife.

  • Condensing Gas Boilers provide low temperature water to fin-tube radiators designed to heat the space year around with the boilers in condensing mode (>90% efficiency).

  • Variable Speed drives are installed on circulation pumps and fans to save electricity and provide greater control.

  • Two high efficiency DX VAV air handling units air condition the building.

  • Occupancy sensors are installed to reduce lighting power when the room is unoccupied. 

  • Cut-off fixtures are installed in the parking lot to reduce light pollution. 

  • Electric vehicle charging stations are located in the parking lot.

  • Electricity is sub-metered to allow tenants to track their energy use. 

  • Low flow plumbing fixtures save water and energy used to heat domestic water.