RCMP Division 'H' Headquarters
RCMP Division 'H' Headquarters
$1.00
Location: Dartmouth, Nova Scotia
Client: Public Works and Government Services Canada
Architect: Lydon Lynch Architects
Certifications: LEED Canada-NC Gold
Size: 160,000 sq. ft.
Project Budget: N/A
M&R Engineering was responsible for mechanical design including HVAC, Plumbing and Fire Protection as well as electrical design including Lighting, Power, Communications and Security.
Key Facts:
- Efficient Building Envelope with triple glazed windows.
- Condensing Gas Boilers.
- Variable Speed Magnetic Bearing Chiller
- Variable Speed drives are installed on circulation pumps and fans to save electricity and provide greater control.
- Energy Recovery is installed in Air Handling Units to recover heat from exhaust air.
- Occupancy sensors are installed to reduce lighting power when the room is unoccupied.
- Daylight sensors are used to control perimeter lighting; lights dim when there is sufficient daylight available.
- Cut-off fixtures are installed in the parking lot to reduce light pollution.
- An IAQ system is installed that monitors Carbon Dioxide (CO2), Particulate Matter (PM), Humidity, Total VOCs and Temperature.
- Low flow plumbing fixtures save water and energy used to heat domestic water: 4.8 L/flush and dual flush toilets, 0.5 L/flush urinals, 1.9 L/min lavatories, 5.7 L/min sinks, 7.6 L/min showers.
- Rainwater Cistern collects runoff from the roof and supplies toilets and urinals saving city water and reducing runoff into the storm system.
- Energy modeling indicates energy cost savings of 43% compared to the energy code (MNECB).